Study on the Sequence of Parts with Constrains of Earliness and Tardiness in Job-Shop


ZHOU Zuo_hua1,YAN Ping2,YANG Bo2

DOI:10.11835/j.issn.1674-4764.1999.03.023

Received ,Revised , Accepted , Available online July 01, 2015

Volume ,1999,Pages 110-113

  • Abstract
The Earliness/Tardiness problem in job_shop is discussed in this paper.Based on the analysis of practical situations and lot transfer between stages,an integer programming mode is proposed,The solution is obtained by the application of Lagrangian relaxation technique.