Current article

Construction Technology for the Main Bridge Pier of Citong Bridge in Quanzhou City


XU Si fa 1,BEI Hang 2

DOI:10.11835/j.issn.1674-4764.2001.05.015

Received ,Revised August 30, 2001, Accepted , Available online July 01, 2015

Volume ,2001,Pages 71-75

  • Abstract
The Citong Bridge is located in the river estuary section with 4 meter tide range and mixed geological structure. In this paper, the technique for construction of the main bridge pier was presented in detail, which consists of the construction process, technological requirements, main construction parameters and amendment on defects. It is of great value for reference to the similar works.