Current article

Construction Technology for Bid Construction Part B of Yangtze River Bridge in Jiangyin City


DONG Ying

DOI:10.11835/j.issn.1674-4764.2001.05.018

Received ,Revised , Accepted , Available online July 01, 2015

Volume ,2001,Pages 85-90129

  • Abstract
In this paper, the advanced construction technology and site management applied in bid construction part B of Yangtze River bridge in Jiangyin was presented in detail. This bridge is the largest span bridge in China, where the advanced technology applied is: 3-d coordinate control surveying in bridge tower, small powder for artificial pile, over-form and climb form in construction of tower column, temperature control for casting mass concrete. It is of great value for reference to large bridge building.