Current article

Adjusting Experience and Analysis of Primary Treatment Process in Yucheng Sewage Treatment Plant, Shandong


WANG Tao,XIONG Ai-ling,DENG Rong-sen,LOU Shao-hua,LI Lie-feng

DOI:10.11835/j.issn.1674-4764.2004.02.029

Received ,Revised October 16, 2003, Accepted , Available online July 01, 2015

Volume ,2004,Pages 129-133

  • Abstract
The adjusting operation for Yucheng wastewater treatment plant (WWTP) is introduced. In this paper, the problems during the course of testing operation from the starting condition of bacterium tamed, the installation of equipment and the hydraulic flow performance etc. are analyzed and discussed. Based on abovementioned, it is pointed out that there is some adjusting operational experience suit for middle-small town WWTP facing with bigger fluctuation of influent quantity and higher impact load.