BP Algorithm Evaluation Model of Political Risk in International Construction Projects


HU Wen - fa

DOI:10.11835/j.issn.1674-4764.2006.04.025

Received January 15, 2006,Revised January 15, 2006, Accepted , Available online July 01, 2015

Volume ,2006,Pages 98-100105

  • Abstract
Political risk is one of the common risks in international construction projects, the political risk is analyzed in this paper and an evaluation model of political risk in international construction projects is presented based on BP algorithm, The model is a self- study and self- adaptive one in risk evaluation. Through the simulation study with practice data, with this model the cost improvement of international construction projects can be predicted in political risks exactly, it is useful in evaluating the comprehensive political risk.