Volume ,Issue 2,1999 Table of Contents

   
Other Issues:  
  

Contents

Study on Analysis Methods for Rock Slope FoundationStability of the Highrise Building[Abstract][View PDF]

A Study on Correlativity of Peak Values of Horizontal Ground Motions[Abstract][View PDF]

Suggestion for Moment Modulation of Prestressed Concrete Continuous Beams[Abstract][View PDF]

Application of Photoelastic Stressmeter to the Mine Stope 570 of the Thin_lodes in Dachang Tongkeng Tin Mine[Abstract][View PDF]

Optimum Design for Pile Group Foundation and ItsApplication in Factory Building[Abstract][View PDF]

A Discussion about the Skills of Construction Programme Design Under the New Engineering Conditions[Abstract][View PDF]

Double Grey Prediction on Fast Load Test[Abstract][View PDF]

Discussion on the Problem of the Calculation Formula forElastodynamics with Boundary Element Method[Abstract][View PDF]

A Calculating Method for the Crack Tensor of theOrthotropic Rockmass by the Elastic Wave Velocity[Abstract][View PDF]

Study on Seepage Model of Rock Mass in Baodingshan Grotto Area of Dazu County[Abstract][View PDF]

A New Method of Separating the Shear Waves Splitting in Anisotropic Media[Abstract][View PDF]

The SFEM Analysis on the Jinlongshan Slope of the Ertan Project[Abstract][View PDF]

Analysis of Experimental Performance of Dynamic Mixed-mode Fracture Initiation in Rock[Abstract][View PDF]

Elastic_Brittle Fracture Analysis of Micro_Crackin Concrete Loaded by Stretching Stresses[Abstract][View PDF]

[Abstract][View PDF]

Grey Optimal Options of Design Plans for Deep Cutting Slope[Abstract][View PDF]

Some Engineering Properties of the Dredger Fill[Abstract][View PDF]

The Element-free Method for Elastic Foundation Plates(EFM)[Abstract][View PDF]

The Reliability Analysis of Mohr_Coulomb Criterion for Rockmass[Abstract][View PDF]

Research On Basic Principles of BOT Concession Agreement[Abstract][View PDF]

Commentary on Deformative Increasing QuantityModels in Beam-Columns Analysis[Abstract][View PDF]